Add to Favorites
Share

Hazardous Waste Incineration Heat Recovery Boiler

  • Description
Product Detail

    Equipped with one of the best hazardous waste incineration heat recovery boiler brands, JSDJ Heavy Industry Co.,Ltd is one of the professional quality hazardous waste incineration heat recovery system, hazardous waste incineration waste heat recovery, waste incineration heat recovery boiler, waste heat recovery boiler of waste incineration, waste heat recovery system of hazardous waste incineration manufacturers in China.

    Hazardous Waste Incineration Waste Heat Recovery Boiler 

    Necessity

    It is estimated that the overall global production of hazardous waste is 330,000,000 ton / year, all of which come from pharmaceutical industry, chemical industry, oil refinery, purification of natural gas, etc. The list goes on and on. The title “hazardous” is derived from the corrosivity, toxicity, ignitability, reactivity and infectivity of the waste in forms of gas, liquid, and solid. Industrial hazardous waste has become a “political waste” around the world. One of the effective treatments of hazardous waste is by careful incineration (if ignitable) and, or heat to incinerate (if not ignitable ) in a protected environment. By doing so, a waste heat recovery unit is needed to reduce process cost. 

    Design Ingenuity

    Flue gas emanated from the incineration chamber then entering our waste heat recovery boiler is at temperature of 1050 ? ~ 1100 ?, and it usually contains toxic and corrosive substances ( e.g. heavy metals, salt, chlorides, and so on). Ergo, there’s a well recognized difficulty in ensuring the cleanness of heat surface. We design our waste heat boiler strictly in accordance with the specific gas content details provided by the customer for this type of waste heat recovery application. The overall boiler system features customized suspension-membrane & multi gas channeling structure, along with special measures taken to ensure the heat conduct surface temperature above the dew point of gaseous sulfuric acid, all of which help eliminate the possibility of tube corrosion. The average investment recovery period is around 2 to 3 years. 

    Key Parameters

    Applicable gas quantity: 5000Nm3/h-40000Nm3/h

    Rated steam pressure: 1.0 MPA ~ 4.0 MPA

    PROJECT HAZARDOUS WASTE INCINERATION HEAT RECOVERY FOR: 

    HAZARDOUS WASTE DISPOSAL CENTER OF PANZHIHUACITY 

    Rated steam output: 1.9 T / H @ 1.0 MPA 

    Steam temp: 184 Deg Celsius 

    PROJECT HAZARDOUS WASTE INCINERATION HEAT RECOVERY FOR: 

    YIZHENG CHEMICAL FIBRE CO., LTD.

    Rated steam output: 180 T / H @ 4.5 MPA (largest output in Asia)

    Rated steam temp: 440 Deg Celsius


    PROJECT HAZARDOUS WASTE INCINERATION HEAT RECOVERY FOR: 

    HAZARDOUS WASTE DISPOSAL CENTER OF ZHEJIANG PROVINCE - TAIZHOU CITY 

    Rated steam output: 12 T / H @ 2.5 MPA 

    Rated steam temp: 450 Deg Celsius

Send your message to this supplier
To:  

JSDJ Heavy Industry Co.,Ltd.

* Content:  

For better quotations, include:

- A self introduction

- Special requests, if any

Quantity:  

  
Not exactly what you want? One request, multiple quotations Get Quotations Now >>